Photo gallery
November – 2017: “Construction works at the Museum site”
-
Display: “Musical Houseware” zone, the 2nd floor
-
Display: “Barrel Organs” zone, the 2nd floor
-
Clocks Gallery, the 2nd floor
-
Clocks Gallery, the 2nd floor
-
The Grand Piano installation in the central lobby, the 1st floor
-
Exhibits installation in the central lobby, the 1st floor
-
The Grand Piano
-
Central Lobby, the 1st floor
-
Clocks restoration workshop
-
The Museum depositary
-
In the carpenter's workshop
-
In the arts and crafts workshop